Adduction à partir de la station de dessalement de Honaine w. Tlemcen pour le renforcement en AEP de 18 communes de la w.Sidi Belabes
| dc.contributor.author | BETAOUAF, Imane Kamar | |
| dc.contributor.author | BENAICHA, Mohamed | |
| dc.date.accessioned | 2024-09-09T11:05:14Z | |
| dc.date.available | 2024-09-09T11:05:14Z | |
| dc.date.issued | 2024 | |
| dc.description.abstract | The memorandum entitled "Adduction from the Honaine desalination plant in Tlemcen province to reinforce the drinking water supply of 18 municipalities in Sidi Bel Abbès province" is a project that was carried out for the benefit of Sidi Bel Abbès province, which has been suffering from a water deficit for several years. The managers of the Honaine seawater desalination resource (Tlemcen province) have decided to allocate a quota of 100,000 m3/day to 18 municipalities in Sidi Bel Abbès province by means of a transfer (adduction) over a total length of (30 108) ml. We had the opportunity to study several options through a techno-economic study that highlighted an ideal and economical route. The route in question is divided into 3 sections: 2 gravity sections and 1 pumping section. The linear works include 2 reservoirs of 20,000 m3 each and a pumping station, where we had to dimension the adduction pipes, pumping station, reservoirs, balance chimney and carry out a study for protection against water hammer. In the end, a study of the project cost was necessary, which allowed us to estimate the price of a meter of water at 10.66 DA/m3, taking into account all investment and operating costs. | en_US |
| dc.identifier.uri | http://dspace.univ-temouchent.edu.dz/handle/123456789/5028 | |
| dc.language.iso | fr | en_US |
| dc.subject | Adductions, AEP, dimensionnement, Cheminée d’équilibre | en_US |
| dc.title | Adduction à partir de la station de dessalement de Honaine w. Tlemcen pour le renforcement en AEP de 18 communes de la w.Sidi Belabes | en_US |
| dc.type | Thesis | en_US |
