etude d'un pont a poutres en beton precontraint

Loading...
Thumbnail Image

Date

Journal Title

Journal ISSN

Volume Title

Publisher

Abstract

The project developed in this memory is a study of a girder bridge prestressed concrete Located in Zéralda its starting point by Pk182 During our study of this project, we talked about the different stages of execution of a work of art; also how to apply all regulations and the use of computer tools for modeling and analysis of our work The structure has a length of 72m, it rests on two abutments and a bent and the total length of the span is 36m with a width equal apron 10.50m compound 5 girders spaced 2.25m prestressed concrete.

Description

Citation

https://theses.univ-temouchent.edu.dz/opac_css/doc_num.php?explnum_id=1296

Collections