etude d'un pont a poutres en beton precontraint
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
The project developed in this memory is a study of a girder bridge prestressed concrete Located in Zéralda its
starting point by Pk182
During our study of this project, we talked about the different stages of execution of a work of art; also how to
apply all regulations and the use of computer tools for modeling and analysis of our work
The structure has a length of 72m, it rests on two abutments and a bent and the total length of the span is 36m
with a width equal apron 10.50m compound 5 girders spaced 2.25m prestressed concrete.
Description
Citation
https://theses.univ-temouchent.edu.dz/opac_css/doc_num.php?explnum_id=1296
