PERT برمجة وتقييم المشاريع باستخدام أسلوب تقييم ومراجعة البرامج : مع دراسة حالة : مؤسسة للبناء مشروعمدرسة صنف (د) بعين تموشنت

dc.contributor.authorكرمان, سعاد
dc.contributor.authorحسناوي, اكرام
dc.contributor.authorجباري, لطيفة
dc.date.accessioned2024-09-22T08:28:00Z
dc.date.available2024-09-22T08:28:00Z
dc.date.issued2020
dc.description.abstractThe program (or project ) evaluation and review technique ( PERT ) is one of the most important topics that attracts the attention of investors by providing information that contributes to project feasibility studies to estimate the likelihood of success of an investment before it actual implementation. In this study, we aim to shed light on the most important methods of network analysis used in the field of project evaluation PERT, and to demonstrate its importance in controlling the cost and duration of the construction project. As a conclusion, the application of these methods in Algeria remains limited, despite the great importance of mathematical and statistical models in the evaluation of pr ojects.en_US
dc.identifier.urihttp://dspace.univ-temouchent.edu.dz/handle/123456789/5220
dc.language.isootheren_US
dc.publisherUniversity of Ain Temouchenten_US
dc.subjectProjects - Project management - Project evaluation - Feasibility study - Network Analysis - PERTen_US
dc.titlePERT برمجة وتقييم المشاريع باستخدام أسلوب تقييم ومراجعة البرامج : مع دراسة حالة : مؤسسة للبناء مشروعمدرسة صنف (د) بعين تموشنتen_US
dc.typeThesisen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
EGE-2 apres.pdf
Size:
9.51 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: