Raccordement d’assainissement de M’SAID et HOUAOURA Vers la STEP de Bouzedjar

dc.contributor.authorBELKHEIR, Bounoua Lotfi
dc.contributor.authorDRISS, Mohammed
dc.contributor.authorBEN AICHA, Mohammed
dc.date.accessioned2024-09-09T10:58:25Z
dc.date.available2024-09-09T10:58:25Z
dc.date.issued2024
dc.description.abstractThis thesis addresses the project of connecting the wastewater systems of Houaoura and M‟said to the wastewater treatment plant (WWTP) in Bouzedjar. These two localities face major challenges in wastewater management due to inadequate infrastructure, resulting in significant health and environmental risks. The project's objective Is to improve wastewater treatment by connecting both localities to a central treatment plant, thus contributing to public health and environmental protection. After studying various options, it was determined that constructing a single common WWTP is more economical and simplifies operational management compared to building two separate WWTPs. In conclusion, the option of a common WWTP was chosen for its cost-effectiveness and operational efficiency. This project will enhance wastewater management, protect the environment, and improve the sanitary conditions of the local populations, while providing a sustainable and economically viable solution.en_US
dc.identifier.urihttp://dspace.univ-temouchent.edu.dz/handle/123456789/5027
dc.language.isofren_US
dc.titleRaccordement d’assainissement de M’SAID et HOUAOURA Vers la STEP de Bouzedjaren_US
dc.typeThesisen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
memoire2024 - Hamid Bl.pdf
Size:
4.79 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections