Calcul Du Flambage De La Garniture De Forage D’un Puits Pétrolier Dans La Deuxième Phase (300 A 2000 M)

dc.contributor.authorBOUYAHIA Bouabd, Ellah Soufiane
dc.contributor.authorMOKRANE, Omar
dc.date.accessioned2024-02-13T13:24:05Z
dc.date.available2024-02-13T13:24:05Z
dc.date.issued2015
dc.description.abstractBuckling of the drill string of an oil well and that are greater than 2 km can be dangerous risk of the drill string. Indeed, the buckling can destabilize the packing and leads to an abrupt manner to its rupture. The aim of our work is to prevent buckling of the pad, it has been designed with a theoretical and numerical study using the Ansys finite element calculation software. The results have shown that the addition of 44 mm drill collars at the bottom of the shaft to apply the WOB is merely necessary to avoid such buckling of drill rodsen_US
dc.identifier.citationhttps://theses.univ-temouchent.edu.dz/opac_css/doc_num.php?explnum_id=2040en_US
dc.identifier.urihttp://dspace.univ-temouchent.edu.dz/handle/123456789/2200
dc.subjectdrilling , the drill bits , , buckling of the drill string , the packing of the drillingen_US
dc.titleCalcul Du Flambage De La Garniture De Forage D’un Puits Pétrolier Dans La Deuxième Phase (300 A 2000 M)en_US

Fichiers

Bundle original

Voici les éléments 1 - 1 sur 1
En cours de chargement...
Vignette d'image
Nom:
Calcul Du Flambage De La Garniture De Forage D’un Puits Pétrolier Dans La Deuxième Phase (300 A 2000 M).pdf
Taille:
212.37 KB
Format:
Adobe Portable Document Format

Bundle de license

Voici les éléments 1 - 1 sur 1
En cours de chargement...
Vignette d'image
Nom:
license.txt
Taille:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: