Calcul Du Flambage De La Garniture De Forage D’un Puits Pétrolier Dans La Deuxième Phase (300 A 2000 M)
Loading...
Date
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Buckling of the drill string of an oil well and that are greater than 2 km can be dangerous risk
of the drill string. Indeed, the buckling can destabilize the packing and leads to an abrupt
manner to its rupture. The aim of our work is to prevent buckling of the pad, it has been
designed with a theoretical and numerical study using the Ansys finite element calculation
software. The results have shown that the addition of 44 mm drill collars at the bottom of the
shaft to apply the WOB is merely necessary to avoid such buckling of drill rods
Description
Citation
https://theses.univ-temouchent.edu.dz/opac_css/doc_num.php?explnum_id=2040
