ETUDE D’UN OUVRAGE D’ART SUR OUED EL MALEH A LA RN 108 AU PK 56+180
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
The work presented in the present report consist of the study of an engineering work situated
in the National Road 108 which is still in progress
He project joins within the framework of the operation of the halving of the RN 108 on 20
KM connecting AIN TEMOUCHENT with HAMMAM BOUHDJAR , as which the
realization of this work serves as a natural obstacle (OUED EL MALEH) on one hand and on
the other hand allows to serve the second way recently created .
The structure consist of three spans of 27M of twelve beams spaced by 0,9 M in prestressed
concrete with a slab of 25 cm .
A detailed study has been elaborated on the structural element of this bridge in particular
(studies of the deck, beams and supports) the work carried out using finite element methods
using the SAP2000 numerical code .
The results of the modeling have led to dimensioned and verify the various criteria of stability
and security of this infrastructure.
Description
Keywords
Citation
https://theses.univ-temouchent.edu.dz/opac_css/doc_num.php?explnum_id=1403
