Étude de la supervision de la Centrale Electrique de TERGA(SKT) Cas d’étude : supervision de la chaudière

dc.contributor.authorBELRABA, Saida
dc.contributor.authorBENMOSTEFA, Sid Ahmed Amine
dc.date.accessioned2024-02-25T15:12:29Z
dc.date.available2024-02-25T15:12:29Z
dc.date.issued2021
dc.description.abstractThis work consists of both studying the operation of the 3 × 400 MW TERGA Combined Cycle Power Plant located in Ain Témouchent, and understanding the supervision process put in place for the management and monitoring of the control system. To do this, we have defined thermal power plants in Algeria as well as the various existing types. Then, we gave the description and general operation of the TERGA 3 × 400 MW Combined Cycle Power Plant with their different zones. Then, we approached industrial supervision in general and gave the supervision process of the TERGA 3 × 400 MW Combined Cycle Power Plant more specifically; And finally, we took a concrete example of boiler supervision and saw how we could monitor and control the levels of the three balloons.en_US
dc.identifier.citationhttps://theses.univ-temouchent.edu.dz/opac_css/doc_num.php?explnum_id=4027en_US
dc.identifier.urihttp://dspace.univ-temouchent.edu.dz/handle/123456789/2625
dc.subjectPower plant, SKT, ALSPA, industrial supervision, HMI, Boiler.en_US
dc.titleÉtude de la supervision de la Centrale Electrique de TERGA(SKT) Cas d’étude : supervision de la chaudièreen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Étude de la supervision de la Centrale Electrique de TERGA(SKT) Cas d’étude supervision de la chaudière.pdf
Size:
3.48 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections