Étude de la supervision de la Centrale Electrique de TERGA(SKT) Cas d’étude : supervision de la chaudière
| dc.contributor.author | BELRABA, Saida | |
| dc.contributor.author | BENMOSTEFA, Sid Ahmed Amine | |
| dc.date.accessioned | 2024-02-25T15:12:29Z | |
| dc.date.available | 2024-02-25T15:12:29Z | |
| dc.date.issued | 2021 | |
| dc.description.abstract | This work consists of both studying the operation of the 3 × 400 MW TERGA Combined Cycle Power Plant located in Ain Témouchent, and understanding the supervision process put in place for the management and monitoring of the control system. To do this, we have defined thermal power plants in Algeria as well as the various existing types. Then, we gave the description and general operation of the TERGA 3 × 400 MW Combined Cycle Power Plant with their different zones. Then, we approached industrial supervision in general and gave the supervision process of the TERGA 3 × 400 MW Combined Cycle Power Plant more specifically; And finally, we took a concrete example of boiler supervision and saw how we could monitor and control the levels of the three balloons. | en_US |
| dc.identifier.citation | https://theses.univ-temouchent.edu.dz/opac_css/doc_num.php?explnum_id=4027 | en_US |
| dc.identifier.uri | http://dspace.univ-temouchent.edu.dz/handle/123456789/2625 | |
| dc.subject | Power plant, SKT, ALSPA, industrial supervision, HMI, Boiler. | en_US |
| dc.title | Étude de la supervision de la Centrale Electrique de TERGA(SKT) Cas d’étude : supervision de la chaudière | en_US |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- Étude de la supervision de la Centrale Electrique de TERGA(SKT) Cas d’étude supervision de la chaudière.pdf
- Size:
- 3.48 MB
- Format:
- Adobe Portable Document Format
- Description:
License bundle
1 - 1 of 1
Loading...
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description:
