ETUDES DES CANALISATIONS ÉLECTRIQUES

dc.contributor.authorBEN MIMOUN, YOUCEF
dc.contributor.authorGUERIDA, ELABBES
dc.date.accessioned2024-02-21T09:38:16Z
dc.date.available2024-02-21T09:38:16Z
dc.date.issued2021
dc.description.abstractIn this work, we studied the electrical pipes (electrical cables) and their components (conductor + protective conduit) as well as how to install them either by hanging them in the air or placing them on the ground or under water, according to the rules and laws adopted at the international level. As a practical case, we studied the Sonelgaz Adrar pipeline.en_US
dc.identifier.citationhttps://theses.univ-temouchent.edu.dz/opac_css/doc_num.php?explnum_id=4021en_US
dc.identifier.urihttp://dspace.univ-temouchent.edu.dz/handle/123456789/2514
dc.titleETUDES DES CANALISATIONS ÉLECTRIQUESen_US

Fichiers

Bundle original

Voici les éléments 1 - 1 sur 1
En cours de chargement...
Vignette d'image
Nom:
ETUDES DES CANALISATIONS ÉLECTRIQUES.pdf
Taille:
14.28 MB
Format:
Adobe Portable Document Format
Description:

Bundle de license

Voici les éléments 1 - 1 sur 1
En cours de chargement...
Vignette d'image
Nom:
license.txt
Taille:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections