Please use this identifier to cite or link to this item:
http://dspace.univ-temouchent.edu.dz/handle/123456789/5027
Title: | Raccordement d’assainissement de M’SAID et HOUAOURA Vers la STEP de Bouzedjar |
Authors: | BELKHEIR, Bounoua Lotfi DRISS, Mohammed BEN AICHA, Mohammed |
Issue Date: | 2024 |
Abstract: | This thesis addresses the project of connecting the wastewater systems of Houaoura and M‟said to the wastewater treatment plant (WWTP) in Bouzedjar. These two localities face major challenges in wastewater management due to inadequate infrastructure, resulting in significant health and environmental risks. The project's objective Is to improve wastewater treatment by connecting both localities to a central treatment plant, thus contributing to public health and environmental protection. After studying various options, it was determined that constructing a single common WWTP is more economical and simplifies operational management compared to building two separate WWTPs. In conclusion, the option of a common WWTP was chosen for its cost-effectiveness and operational efficiency. This project will enhance wastewater management, protect the environment, and improve the sanitary conditions of the local populations, while providing a sustainable and economically viable solution. |
URI: | http://dspace.univ-temouchent.edu.dz/handle/123456789/5027 |
Appears in Collections: | Hydraulique |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
memoire2024 - Hamid Bl.pdf | 4,9 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.