Please use this identifier to cite or link to this item:
http://dspace.univ-temouchent.edu.dz/handle/123456789/2867
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | BEKRARCHOUCH, Mokhtar | - |
dc.contributor.author | AZZOUZ, Mohamed El Amine | - |
dc.date.accessioned | 2024-03-06T08:43:59Z | - |
dc.date.available | 2024-03-06T08:43:59Z | - |
dc.date.issued | 2019 | - |
dc.identifier.citation | https://theses.univ-temouchent.edu.dz/opac_css/doc_num.php?explnum_id=2429 | en_US |
dc.identifier.uri | http://dspace.univ-temouchent.edu.dz/handle/123456789/2867 | - |
dc.description.abstract | We noticed that the wastewater coming from Ain Kihal and Sidi Zaydour are throw directely to a valley without any treatement, as a result of that many problems had appeared so the best solution is the build of a wastewater treatement plant. We did this project in order to do a study of the area, choose a suitable place of the future plant witch is still in progress, then we will do a specific sizing of the future wastewater plant after of course the knowledge of the wastewater debit and the number of the population each 10 years from 2015 to 2050. We found that each 10 years the population rise and the wastewater rise too, so we must do an extension after reaching 2050. | en_US |
dc.title | Dimensionnement et exploitation d'une station d'épuration à boue activé cas step d'ain el kihal | en_US |
Appears in Collections: | Hydraulique |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Dimensionnement et exploitation d'une station d'épuration à boue activé cas step d'ain el kihal.pdf | 5,95 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.